Legal
Environmental Practices Statement
What we do to protect the ground we work on, and — just as important — the environmental claims we refuse to make.
Last updated: July 27, 2026
Working within a land manager's plan
Where a property has a grazing prescription, restoration plan, resource-agency condition, or biological constraint, we execute to that plan. We do not author biological determinations, write rangeland management plans, or represent ourselves as the certifying professional. Where a project needs that expertise, it comes from the qualified professional on the project team.
Sensitive areas
- Sensitive species, riparian corridors, wetlands, special-status plant populations, and cultural resources identified at site review are excluded from grazing.
- Exclusions are enforced by where the fence goes, not by instructing herders to keep animals away. A physical boundary holds; an instruction does not.
- Where an agency or resource professional sets a seasonal or species-driven timing window, the grazing schedule is built around it.
Soil and water
- Cell rotation is planned to meet the vegetation objective without overgrazing, which is what protects soil cover and reduces erosion risk.
- Water points, supplement stations, and high-traffic areas are placed away from drainages and moved when ground begins to degrade.
- Grazing on saturated soils is avoided where it would cause compaction or bank damage.
Reduced chemical and mechanical intervention
Targeted grazing can reduce reliance on herbicides and heavy equipment for a given piece of ground. That is a practical benefit of the method on suitable sites. It is not a guarantee that any particular project will eliminate herbicide or equipment use, and we do not present it as one.
Invasive species
Grazing can suppress many invasive and undesirable species when timed to their growth stage. Durable change in species composition takes repeated, correctly-timed grazing across multiple seasons, usually alongside the land manager's wider restoration work. We describe expected outcomes in those terms rather than as eradication.
Claims we do not make
We will not state, and you should not infer, that our work provides:
- Guaranteed fire prevention
- Guaranteed vegetation elimination
- Guaranteed environmental or habitat benefits
- Guaranteed insurance savings
- Carbon sequestration, offset, or climate benefits we have not measured
- Certification, accreditation, or agency approval the company has not obtained
Fuel reduction reduces available fuel. It does not prevent fire, and no vegetation-management method does. Anyone telling you otherwise is selling something.
Compliance
Projects are planned to align with the environmental requirements that apply to the specific property and agency. Where a permit, authorisation, or environmental review is required, its status is confirmed before mobilization rather than assumed.
Contact about this policy
Questions, requests, or complaints about this page can be sent through our contact form.
Project suitability, pricing, grazing outcomes, timing, and regulatory requirements vary by property and agency. A site review is required before any proposal, schedule, or performance commitment is issued.